1950s cottage, full renovation
Rewire, replumb, new kitchen and two bathrooms. Original jarrah floors and ceilings kept and restored.
- Floor area
- 146 m²
- On site
- 11 weeks
- Contract
- Fixed price, held
Older Perth homes brought up to standard without stripping the character out of them.
Perth has a lot of solid double-brick homes with original jarrah under the carpet, a kitchen that has been patched twice and wiring that predates the RCD. They are worth keeping, and they are genuinely difficult to renovate well.
The risk with a full renovation is not the visible work. It is what is behind the wall: the plumbing that has to come out anyway, the lintel nobody expected, the asbestos eaves. Those are the discoveries that turn a renovation into a running argument about money.
We open up and investigate before we price, not after. That means selective demolition at the quoting stage where the owner allows it, a plumber and a sparky through the house early, and an allowance written into the contract for the things an older home reliably hides.
Structural, electrical and plumbing come first and get done properly — new switchboard and RCDs, replumbed to current standard, any structural repair addressed rather than covered. The finishes follow. It is the unglamorous half, and it is why a renovation still feels right in ten years.
On character homes we work to keep what is worth keeping. Original jarrah floors get lifted, stored and relaid rather than replaced. Ceiling roses, picture rails, fretwork and leadlight are protected during demolition, not swept up with it.
Every full renovations job runs the same way. The stage you are in, and what you get at the end of it, is written down before you sign anything.
We go through the house room by room, note what is worth keeping and flag the likely surprises before you spend anything.
Selective opening-up, trade assessments and a written scope. This is where a renovation is won or lost.
One number, with a documented allowance for anything genuinely unknowable behind a wall.
Demolition, structural repair, rewire and replumb. The messy half, done first.
Joinery, tiling, painting, floors relaid and restored, fixtures fitted off.
Defect walk-through, full clean, certificates handed over and the six-month check booked.
Renovation cost tracks the condition of what is already there far more than the size of the house. A tidy 1950s home that just needs updating is a very different job to one that needs re-stumping and a full rewire.
Whole-house renovations generally start around $180,000. Kitchen-and-bathroom scopes with no structural work sit well below that.
Indicative
From $180k
We price after investigation, not before, so the number you sign is the number you pay.
Fremantle, 2024. Suburb, time on site, whether the price held and whether the owners stayed in the house — the four things people actually check.
“We lived in the house through the whole renovation with two kids. They kept it sealed off, cleaned up every single day, and always told us what was happening the following week.”
We investigate before we price, and we write an allowance into the contract for the things an older Perth home reliably hides — old plumbing, missing lintels, asbestos eaves. If something genuinely unforeseen turns up we show you, price it, and you sign before we touch it.
In most cases yes. Jarrah floors get lifted carefully, stored on site, then relaid and sanded at the end. Where boards are past saving we source matching second-hand timber rather than putting new next to old.
For a whole-house renovation, usually yes for at least part of it — there is a period with no working kitchen or bathroom. We will tell you honestly at the site visit which weeks those are so you can plan, rather than promising you can stay and revising it later.
Yes, and we work to the conditions rather than around them. If your house is on a municipal inventory or in a heritage precinct we deal with the local government heritage officer as part of the approvals.
Sometimes, and sometimes it costs more than doing it once. Rewiring and replumbing in stages means opening the same walls twice. We will map both options at the site visit and be straight with you about which one is cheaper overall.
We build across Inner north, Western suburbs, River south, Coastal north, Fremantle and around — see the full list on the service areas page.
Free to have us out, about an hour on site, and you leave with a written summary of what is feasible and a realistic budget band.